Due to the postal strike, delivery and receipt of mailed documents, payments, and notices may be delayed. Please use our online or in-person options. Read the news release and you can also contact us for help.
Your drawings must clearly show what is existing and the changes you want to make. Drawings must be to scale and should use metric measurements.
When converting existing space into a second, third or fourth unit, such as a basement apartment, you’ll need to submit the following drawings and documents. We may request additional information when your application is reviewed.
The site plan must include:
The floor plan must include:
Elevations are required for each side of the project. They must include:
For more information about required documents, call 311 (905‑615‑4311 outside City limits).