Open for consultation City project

Winston Churchill Boulevard integrated road project

The City of Mississauga is planning improvements and renewals to Winston Churchill Boulevard between The Collegeway and Unity Drive/Unity Gate.

You can also send in your questions or feedback:

Submit questions

Milestones
  1. 1
    2025 to 2026 Preliminary design

    Complete the study, public consultation and preferred design selection

  2. 2
    2027 to 2028 Detailed design and tender

    Field investigations, permits and approvals, contract documents and the awarding of the construction contract

  3. 3
    To be determined: Construction and restoration

    Construction and restoration timing will be confirmed during the detailed design and is subject to approval by City Council

Overview

The City has started a planning and preliminary design study for road improvements and renewals to the Winston Churchill Boulevard study area.

The study area extends along Winston Churchill Boulevard from The Collegeway to Unity Gate and Drive. Study area map showing the area to be studied from The Collegeway to Unity Gate/Unity Drive along Winston Churchill Boulevard.

The project is exempt under the Municipal Class Environmental Assessment process (amended 2024), which is approved under the Ontario Environmental Assessment Act.

Planned improvements and renewals

We’re considering a range of roadway improvements and design features that support walking, cycling and public transit.

Some of the work being considered for Winston Churchill Boulevard includes:

  • Pavement repairs and resurfacing
  • Curb replacements and realignments
  • Streetlight pole replacements and lighting upgrades
  • Widened sidewalks
  • Transit stop improvements
  • New features including:
    • In-boulevard multi-use trail
    • Crossrides
    • Protected intersection features (to be confirmed during the detailed design)
    • Noise walls (to be confirmed during the detailed design)

The improvements focus on road safety, aligning with the City’s approved Vision Zero Action Plan.

Public engagements

We’ll present information about the project and collect comments and concerns. Public feedback will be considered during the preliminary design phase.

Question forum

Over the course of the project, we’ll integrate our answers to your questions into this project page. Send in your questions.

Project contact

For more information about this study, call 311 (905-615-4311 outside city limits) or email your questions or comments to:

Erik Nevland, Project Engineer, Transportation Projects
erik.nevland@mississauga.ca

Cyrus Hiranandani, Coordinator, Transportation Projects
cyrus.hiranandani@mississauga.ca

View all projects